Geothermal Powerplant
| |
Tag | CORGEO |
Class | ENERGY |
Built by | |
Tech Level | 2 |
Metal Cost | 505 |
Energy Cost | 9375 |
Build Time | 12875 |
Max Velocity | N/A |
Acceleration | N/A |
Turn Rate | N/A |
The Geothermal Powerplant is a level 2 structure available to both the CORE and the ARM. It can only be built on top of thermal vents and adds +250 to the player's energy production, which is high considering its fairly cheap price and low build time. As it provides very reliable energy, it is advantageous to seize control of as many thermal vents as the player can manage until fusion power becomes available.
Commander's Handbook[]
CORE[]
Geothermal Powerplant This must be built over a geothermal vent (a spot with steam rising from the ground). |
ARM[]
Geothermal Powerplant This Geothermal Powerplant must be built over a geothermal vent (a spot with steam rising from the ground). |